After any new development in the equipment, both produced by Consortium "MS&E" and outer supply, every station and system are laboratory tested. If the results are good the equipment is also tested for at least a year under natural conditions. This is demand by the Quality Control System ISO 9001:2008 of Consortium "MS&E". After full analysis and ensuring the reliability of the new production it can be put on the market.
For testing the production under natural conditions "MSE" has equipped 1000 sqm park in Sofia. In 2007 has finished the building of laboratory complex near the meteorological park. This is all that's needed for the necessary tests on the production of Consortium "MS&E".
Meteo Park
The house-top of the laboratory complex. Testing different wind sensors.